TF-PSA-Crypto 1.2.0 mergeback #832

Merged
minosgalanakis merged 128 commits from tf-psa-crypto-1.2.0_mergeback into development 2026-07-07 15:43:48 -05:00
minosgalanakis commented 2026-07-07 11:21:33 -05:00 (Migrated from github.com)

Description

This pr:

  • Merges the release tag into development
  • Updates the framework pointer

PR checklist

Please remove the segment/s on either side of the | symbol as appropriate, and add any relevant link/s to the end of the line.
If the provided content is part of the present PR remove the # symbol.

## Description This pr: - Merges the release tag into development - Updates the framework pointer ## PR checklist Please remove the segment/s on either side of the | symbol as appropriate, and add any relevant link/s to the end of the line. If the provided content is part of the present PR remove the # symbol. - [ ] **changelog** provided | not required because: - [ ] **framework PR** provided Mbed-TLS/mbedtls-framework#311 - [ ] **TF-PSA-Crypto development PR** provided - [ ] **TF-PSA-Crypto 1.1 PR** provided #831 - [ ] **mbedtls development PR** provided Mbed-TLS/mbedtls#10817 - [ ] **mbedtls 4.1 PR** provided Mbed-TLS/mbedtls#10816 - [ ] **mbedtls 3.6 PR** provided Mbed-TLS/mbedtls#10815 - **tests** provided | not required because:
gilles-peskine-arm (Migrated from github.com) approved these changes 2026-07-07 15:13:24 -05:00
gilles-peskine-arm (Migrated from github.com) left a comment

This is a correct merge of the 1.2.0 release with the development branch, plus an update of the framework to a commit that is an ancestor of main and identical to main after merging https://github.com/Mbed-TLS/mbedtls-framework/pull/311.

development is an ancestor of the head of this PR, so we can bypass the merge queue. (But the PR CI is still running as I write this.)

This is a correct merge of the 1.2.0 release with the development branch, plus an update of the framework to a commit that is an ancestor of `main` and identical to `main` after merging https://github.com/Mbed-TLS/mbedtls-framework/pull/311. `development` is an ancestor of the head of this PR, so we can bypass the merge queue. (But the PR CI is still running as I write this.)
Sign in to join this conversation.
No milestone
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
gh-Mbed-TLS/TF-PSA-Crypto!832
No description provided.